Microscope | Current Problems | Recently Fixed Items | New Requirements |
---|---|---|---|
Olympus FV1000 | No problem |
Installed a new HDD with Windows XP SP2 and ASW 2.1c (3/23/2011). |
No new requirements |
Olympus Gemini | No problem | Multiline Ar laser (488 nm) has been fixed on 2/8/2010. The counter started at 116.0 hours. | No new requirements |
Olympus DSU Mosaic | No problem | The operating computer was down, but fixed. | No new requirements |
Bio-Rad Radiance 2000 | 442 laser alignment | Kr/Ar laser has been fixed. (3/18/2011) | Regular clean-up every 6 or 12 months |
Bio-Rad RTS 2000 | No problem |
The power supply has been fixed, but the laser power is not stable as before. |
No new requirements |
Bio-Rad MRC 1024 | No problem | 75W Xenon short arc lamp has been installed. The 150W Xenon has been used for Leica SPE II microscope. |
1. Find a better tubing mechanism 2. DIC components |
Olympus Injection Setup | No problem | No recent fixed items | No new requirements |
Leica Fluorescence Stereomicroscope | No problem | No recent fixed items | A new operating computer |
Leica SPE II | No problem | 561 nm laser issues was solved. z-galvo stage was replaced. | The protection has been installed. |
* New requirements for two-photon lasers
Automatic shut-off for Tsunami utilizing the interlock of the laser is necessary. Shut-off can be triggered by an independent temperature monitoring device.